Workover Activities

Workover Activities

The following are common workover tasks that we perform.

 

Additional perforations or re-perforation Standard workovers of production wells - replacement of downhole pumps, rinsing of sand plugs across perforations, removal of scale or wax deposits, special completions (installation of rotary downhole pumps, downhole pressure gauges and bridge plugs), repairs of disposal wells and cementation operations.

Special operations - repair of leaking casing strings or wellhead equipment, including complete wellhead replacement.

General workovers - isolation of produced horizons, development of new and high-pressure horizons, well stimulation via acid treatment and hydraulic fracturing, special completions (packer assemblies, subsurface safety valves, etc.), well performance testing.

Completion of underground injection-withdrawal wells, including casing, milling, underreaming, gravel packing and final completion of the well with gas-tight tubing and packer assembly outfitted with a subsurface safety valve.

Rig 750 HP

 

Rig 550 HP



Related Articles